Skip to main content

New building Tower II, Landesbank Hessen-Thüringen

Acitvities

  • Overall concept, evaluation and realisation
  • Installation of over 220 energy piles (load transfer) at 50 m depth, diameter 150 cm
  • Cooling and heat production in combination with block heating station, absorber refrigerator, hybrid cooler and gas boiler

Technical data

  • Heat capacity of 3.7 MW

  • Cooling capacity of 4.0 MW

Period

  • 1996 - 2000

Location

  • Frankfurt, Germany